Deep Dives

Historical design explorations that informed the Architecture Decision Records

Note

These are historical explorations from the early design phase. With the project’s maturation to a two-donor, three-frame-path model (ADR-025, ADR-026), some content is partially outdated but preserved for context. For current decisions, see the ADRs.

Contents

Document Topic Status
Decision Guide Overview of key design space Partially outdated
Frame & Assembly M10 frame design, squaring, MDF Relevant
X-Y Axis System X-Y motion, smooth rods Relevant
Motor Mounts & Vibration Motor mounting, vibration damping Relevant
X-Gantry Design X-gantry architecture Partially outdated
PSU Configurations Power supply options Outdated
Extruder Decision Pitan selection, single-drive Relevant

What Changed?

The pivot from “Tier 0/1/2/3” to Two Donors + Three Paths (ADR-025, ADR-026) simplified many of these explorations:

  • Scaffold path (M10 + smooth rods) — primary, well-established
  • Mill/Lathe paths — zero-waste donor alternatives
  • Donor fitness tiers — explicit constraints on bed size and Z-height